The R&D and design of any product must rely on proper selection of raw materials, advanced technological measures, stable parts, and perfect manufacturing process before it can be fully transformed into the product. Raw materials, manufacturing process and production line are the key elements of design transformation.
1) Material property requirements for key components of electric vehicle DC contactors
Material | Material Requirement |
Arc extinguishing chamber material | High temperature resistance, High electrical resistance, high mechanical strength, good insulation, stable chemical performance, corrosion resistance |
binding post | High purity, high conductivity, easy welding, corrosion resistance, good welding performance |
magnet yoke | Good corrosion resistance、Good oxidation resistance、high-permeability |
arc-extinguishing medium | Stable performance, good arc extinguishing ability |
Magnetic blowing permanent magnet | stable performance difficult oxidation、Good dielectric properties,High permeability |
Welding spacer of arc extinguishing chamber | low expansion coefficient,well welding property |
Epoxy type sealing material | high voltage withstand、impact resistance、anti-aging、High shear and peel strength,high and low temperature resistant, low shrinkage,small coefficient of linear expansion,high bonding strength |
guide rail | stand wear and tear、flame- resistant,high and low temperature resistant, Lubricate well。 |
2) Key process design and equipment support
Manufacturing process is a sufficient condition to ensure reliable quality and stable performance, must depend on certain hardware establishment to be able to safeguard, Tooling equipment and production line should bear the brunt.
1. Welding technology and welders
Laser welding technology is the key technology to guarantee product quality and reliability, the main purpose of welding is to ensure good sealing effect, the coil and contact are free from oxidation and pollution, ensure the stability of contact resistance.
Necessary equipment: laser welding machine, air tightness detection device, vacuum and gas filling device.
2. Packaging technology and equipment
Pouring technology is one of the key technologies of epoxy sealant contactor. The combination degree of the gel and the product and the density degree of the gel are the key points to be guaranteed.
Necessary equipment: filling machine, vacuum table, drying device.
3. Testing process and equipment
The electrical life of contactor is a key performance index. Loading failure test is the last safeguard checkpoint before the product leaves the factory.
Necessary equipment: Dc power supply, resistance load, intelligent control and protection device
Related Industry Knowledge
- Contactor works
- How to improve life of contactors
- Advantages of heavy duty connector
- What is a relay
- Silver contacts application in low ...
- Contact performance of AC contactor
- Stamping production process
- Button operation mode, protection mode
- Connectors as indispensable compone...
- Connectors use the factors which
- Special requirements for electric v...
- Background of produce small high vo...
- Factors affecting the life of high ...
- Analysis of new energy automobile r...
- Structure and working principle of ...
- The coil of the dc contactor is a b...
- What's the difference between AC co...
- The difference of contact system an...
- Selection of dc contactor
- Eliminate dc contactor, relay arc c...